For a general contractor, the daily report is a coordination problem as much as a documentation one. You're not just recording your own crews — you're tracking every subcontractor on site, consolidating what each one did, and building a master record that protects you when a project slips or an owner disputes a bill. Do it well and you have an authoritative account of the whole job. Do it poorly and you're stuck reconciling conflicting stories months later. Here's how GCs run daily reporting that actually holds up.

The GC's unique reporting challenge

A subcontractor documents one scope. A GC has to capture the whole site: multiple trades, each with their own headcount and progress, plus the interactions between them — the electrician waiting on the framer, the concrete pour that held up the whole east wing. Your daily report is the only document that sees the entire job from above, which is exactly what makes it valuable and hard to keep.

What a GC's master daily report should capture

All trades on site. Every subcontractor, headcount, and hours — your consolidated manpower picture for the day.

Overall work completed. Progress by area and trade, tied to the schedule, not just one scope.

Coordination issues. The interactions that cause most delays: trade stacking, one sub waiting on another, access conflicts. This is where a GC's report earns its keep.

Delays and their sources. Weather, RFIs, owner decisions, late deliveries, sub no-shows — with times and who's responsible. This is your protection in a delay claim.

Inspections and approvals. Every inspection and its outcome, since the GC owns the overall inspection timeline.

Safety. Site-wide safety observations, incidents, and toolbox talks.

Photos covering the whole site, not one trade's corner.

Managing subcontractor reports

Many GCs require each sub to file their own daily report, then consolidate them into the master log. This is smart — it distributes the work and creates cross-checkable records — but it only works if the reports actually come in, in a consistent format, every day. Chasing subcontractors for paper or PDF reports in five different layouts is where the system usually breaks down. The GCs who make it work standardize the format and the channel so consolidating is quick, not a daily hunt.

Why the GC's report is the one that matters most

When a project ends up in a dispute, the GC's master daily log is often the central document — the authoritative, site-wide account everyone else's records are checked against. That's a responsibility: an incomplete or inconsistent master log doesn't just hurt the GC, it weakens the whole project's record. A complete, consistent, same-day master report is one of the most valuable things a GC produces.

Running GC daily reporting in one place

BuildLog is built for the GC's coordination job. Capture your own crews and consolidate the whole site — all trades, coordination issues, delays with their sources, inspections, and safety — in one master daily report, filed on site in minutes and fully offline. Photos attach automatically, every report exports as a branded PDF, and everything syncs to a web dashboard where the office reviews the full site record and pulls weekly and monthly summaries. With subs and supers all reporting into one consistent system, building the master log stops being a daily hunt. There's a free tier to start.

Frequently asked questions

What should a general contractor include in a daily report? A site-wide view: all trades and manpower, overall progress, coordination issues, delays and their sources, inspections, safety, and photos of the whole site — not just the GC's own scope.

Should subcontractors file their own daily reports to the GC? Yes — it distributes the work and creates cross-checkable records. It only works if reports arrive daily in a consistent format, which is easier when everyone uses the same system.

Why is the GC's daily log so important in disputes? It's usually the authoritative, site-wide account of the project, and other parties' records are checked against it. A complete, consistent master log is a GC's strongest protection.


Run the whole site from one master log. Try BuildLog free — iPhone, iPad, and Android.

Get the BuildLog app

Write the day's report, log hours and attach photos — from the site, on your phone.

Download BuildLog on the App StoreGet BuildLog on Google Play

BuildLog is a free construction daily report app for contractors — download the app or read the guides.